Closed
Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
🏛 Serbian Railway Infrastructure JSC
- Submission deadline
- 05.11.2026 12:00 Deadline passed
- Estimated value
-
The customer did not state the amount
Check at the source → - Procedure type
- Restricted procedure
- Source
- TED — Zapadni Balkan National public procurement portal ≈ € (fixed rate) · about the source
Description and specification
The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract.
Open on: TED — Zapadni Balkan ↗
Similar open tenders
- Израда Регионалног плана управљања отпадом
- Израда пројектно-техничке документације санације водоводне мреже у Кањижи
- Техничка контрола Пројекта за грађевинску дозволу за изградњу моста на Дунаву код Бачке Паланке са прилазима
- Израда Плана енерегетске ефикасности Града Новог Сада за 2027. годину
- Израда-ажурирање постојеће тех. прој. Док. реконструкције ватрогасне станице са припадајућим цевоводима и арматуром на ТНС и исходовање свих неопходних сагласности и грађ. дозволе
Where the data comes from and how we read deadlines
- Data is pulled from the official source (TED — Zapadni Balkan) — no manual entry.
- “Urgent” means 7 days or fewer remain until the deadline.
- Data is taken from the portal at publication; check the source portal for changes to the deadline and documents.